TRAC Structural Ltd
Helifix Bridge Repair | HeliBeam and Piling | Helifix Ltd Contact Info | Helifix Technical Information

Whitehill Museum Store, Wiltshire


Piling
This project utilised the ability of the HeliBeam System to span between piles and so avoided the need for continuous underpinning.

Working in conjunction with a Specialist Piling Sub-Contractor, TRAC Structural Ltd designed and installed a combined Helibeam and Piling solution to stabilise the corner of the building where substantial settlement was evident from the extensive tapered cracks in the masonry structure.


Drawing and Photos


The repair is detailed on the installation drawing and utilised the ability of the Helibeam system to span up to 3 meters between the piles.

Without this facility, continuous underpinning would have been required, with the additional cost that this would have entailed.

Click this link to download the Installation Drawing in pdf format.

Click this link to view the drawing and photographs of the project.

DRYFIX_C1