01 Stabilise Bay Window
02 Cladding Tied Back On Three Tower Blocks
03 Stabilise Church Tower
04 Helibeam And Piling Solution
05 Fireplace Repaired In Listed Building
06 Helifix And Ground Anchors To Bridge
07 Quoin Stones Tied Back
08 Stone Lintol Secured In-situ
09 Helifix Repair To Retaining Wall
10 Helifix Stabilisation To Shaldon Bridge
11 Helibeam And Ground Anchors
12 Gable Wall Stabilised
13 Repairs To Gloucester Cathedral
14 Headwall Stabilised On Severn Estuary
15 Bay Windows Tied On Listed Building